Left-over plaster deteriorates with age, and this can make it set so fast you don't have time to put it on. Thistle bonding will fill the chase, but it is a backing plaster so may be difficult to get the surface smooth. This is easier if it is quite a soft mix. You can press this hard against the sound plaster on each side of the chase to press the new plaster to the right level. It is easiest with a plasterers trowel or a broad-bladed metal filling or stripping knife with quite a stiff blade. The patching plaster I tried seemed to stick to the trowel. Unless agreed in writing payment in full must be made on completion of the specified works.īy instructing Premio Group Ltd to undertake the works detailed all terms and conditions listed are agreed.I normally use an ordinary plaster. After this period we will not be held responsible. It is the client’s responsibility to ensure that all problems / concerns relating to an installation, repair, maintenance or test are reported to Premio Group Ltd in writing within 14 days of completion. Such cover does not extend to goods not supplied by Premio Group Ltd, physical damage to products, or any instance where the original installation has been altered or tampered with subsequently by third parties.Ģ. Premio GroupLtd warrants its installation work to be defect free for a period of 14 days from invoice date. All goods supplied shall remain property of Premio Group Ltd until all sums due have been paid in full.ġ. The risk in all goods supplied shall pass to the Client upon delivery.Ģ. Where a Client requires deviation from such regulations, a written instruction and record will be required.ġ. All work where applicable, will be executed fully in compliance with applicable Building Regulations and BS7671 in force at the time of the work, particularly in respect of work in dwellings to allow the legal Part P obligations to be met. All figures quoted are valid for a date of 30 days from the date of the estimate or quotation.ĭeviations from Building Regulations and BS7671:ġ. Any additional work not covered in the original quoted costs will attract additional time charge.Ĥ. Work required outside these hours may attract out of hours premium rates.ģ. Unless stated otherwise, the costs quoted assume standard working hours between the hours of 08:00 hrs – 18:00 hrs Monday to Friday inclusive. The costs quoted assume continuous and unhindered access to the site by prior arrangement with you.Ģ. All extras and variations must be agreed in writing prior to commencement.ġ. Removal from site and disposal of rubble, fittings, wiring, materials, general waste and packaging is not included.ġ. Re-decoration and final making good is excluded from this quote.Ĥ. Except where detailed, builders work (creating of holes larger than 50mm diameter, creating of support structures, etc) are not included, except as outlined in 1 aboveģ. Clearing and / or moving of furniture and other items blocking access to work areas are not included.Ģ. All endeavours will be made to undertake installation work to a clean standard, using dust sheets and vacuum cleaning equipment as necessary.ġ. Where agreed before hand, chases to walls will have round or oval conduit placed to conceal cables, however filling, final finishing of skim coat plaster and final decoration is excluded.ħ. However, consideration of employing a specialist fitter may be prudent, at your cost to effect a fully satisfactory reinstatement.Ħ. Where carpet or flooring coverings may require lifting to allow concealed installation work, no charge is made for this service, with best endeavours being made to avoid damaging them. Where impracticable, cabling will be neatly surface run, either clipping direct or housed in trunking / conduit.ĥ. Unless stated otherwise, all cables will be concealed by chasing into the building fabric or concealed in building voids, under floors, etc. Any works found required to bring the necessary parts of the existing installation up to standard will be at additional cost.Ĥ. Where work is to extend or modify existing circuits, costs quoted assume that the existing installation is in adequate condition and complies with minimum current regulations. All electrical installation work will comply with applicable Building Regulations in force at the time of the works.ģ. All electrical installation work will comply with BS7671:2008 and any amendments in force at the time of the works.Ģ.
0 Comments
Leave a Reply. |
Details
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |